Customization: | Available |
---|---|
Warranty: | 1 Year |
Shaping Mode: | Injection Mould |
Still deciding? Get samples of US$ 60/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Mold Name: | OEM LED Light Cover lampshade Plastic Injection Mould |
Mould No.: | SP201907-019 |
Mould type: | Plastic injection molding |
Mould core material: | NAK80 |
Runner: | Cold runner |
Hardness of stell: | HRC38~42 |
Mould cavity | Multi cavity |
Mould standard: | MISUMI |
Mould installation: | Manual |
Design soft: | NX11 |
Molding surface treatment: | Texture |
Mould Life: | 100 thousand~300 thousand times |
Plastic product material: | PP |
Production process: | Injection molding |
Warranty Period: | 1 year or 100 thousand shots(in this period, if the mold have any problem, we will offer the parts or service by free, but it does't include the problems caused by wrong operation) |
Mould precision: | +_0.01mm |
Ejection system: | Motor/hydraulic cylinder/stripping plate/angle pin, etc.... |
Cooling system: | Water cooling or Beryllium bronze cooling, etc. |
Optional plastic materials: | ABS, PPS, GPPS, HIPS, AS, MS, PMMA, PC, PA6, PA66, PA+GF, PVC, PP, PE, TPE, TPU, TPR, LCP, PBT, PETG, PC/ABS, POM, PC, PPE, PPO, etc...... |
Mould base: | Standard mould base, LKM, HASCO, DME,etc...... |
Fast mold design: | We can be within 1-3 working days after getting customer's drawings. |
Mould testing: | All of the moulds can be well tested before the shipments. Videos testing the moulds are available. |
Mould Lead time: | Plastic moulds: 3- 4 weeks after getting the mould design confirmation. |
Minimum order: | Small orders can be accepted. |
Mould making service | OEM/ODM service is available. |
Mould Safe packing | In strong wooden pallets to avoid any damages during long transportation. |
HS Code: | 8480719090 |
Quality System | ISO9001,SGS,TS16949 |
Specification | Depends on clients' requirements |
Origin | Shenzhen, China |
*2014
Founded YAMANAMI, YAMANAMI was the original company name.
*2015
Invested 2 TOPZEN CNC machines for tooling & machining business.
*2016
Invested another 2 TOPZEN CNC machines for business increasing.
*2017
Invested 2 FANUC high speed CNC machines for tooling business.
*2018
Invested 1 SODICK wire cut machine for precision tooling business.
|
*2019
Registered SENPO, specializes in global tooling & engineering services.
*2020
Invested 1 CROMA CMM measuring machine for precision tooling business.
*2021
Invested 3 MITSUBISHI mirror EDM machines for precision tooling business.
*2022
Invested 3 new injection molding machines for product production business.
*2023
Stop investing and focus on current customer services and developing new clients.
|
**FACTORY EQUIPMENT LIST
NAME |
BRAND |
COUNTRY OF ORIGINAL | STROKE | PRECISION | QTY |
CNC Machine | MAKINO F5 | Japan | 900 * 500 mm | 0.0015mm | 1 |
CNC Machine | FANUC α-T14iFb | Japan | 600 * 450 mm | 0.005mm | 2 |
CNC Machine | TOPZEN850 | Taiwan | 800 * 500 mm | 0.01mm | 2 |
CNC Machine | TOPZEN650 | Taiwan | 600 * 500 mm | 0.01mm | 1 |
CNC Machine | TOPZEN1165 | Taiwan | 1100 * 650 mm | 0.01mm | 1 |
EDM Machine | MITSUBISHI | Japan | 400 * 300 mm | 0.002mm | 3 |
EDM Machine | KYOUMEN | China | 350*250 mm | 0.01mm | 3 |
EDM Machine | TAIYI | Taiwan | 650*450 mm | 0.01mm | 1 |
CMM Measuring Machine | HEXAGON | Sweden | 800 * 600 mm | 0.002mm | 1 |
Project Measuring Machine | 3D FAMILY | Taiwan | 300*200 mm | 0.002mm | 1 |
Height Measuring Instrument | Mitutoyo | Japan | 350 mm | 0.001mm | 1 |
Wire Cut Machine | SODICK | Japan | 400 * 350 mm | 0.001mm | 1 |
Grinding Machine | ELITE | Korea | 400* 300 mm | 0.0005mm | 1 |
Grinding Machine | PENGJING | China | 400* 250 mm | 0.001mm | 2 |
Milling Machine | TAIYI | Taiwan | 800* 400 mm | 0.02mm | 2 |
Injection Machine | HAITIAN | China | 250TON | NA | 2 |
Injection Machine | SUMITOMO |
Japan |
180TON | NA | 2 |
Product Engineerng Services
|
Mold Manufacturing Services
|
Product Manufacturing Services
|
1.Plastic & metal product 3D design support, optimizing.
2.Plastic & metal product engineering DFM, solution.
3.Plastic & metal prototype manufacturing, testing.
|
1.Plastic & die casting mold DFM, design, mold flow. 2.Plastic & die casting mold manufacturing. 3.Plastic & die casting mold injection molding. |
1.Plastic & metal part secondary process. 2.Plastic & metal part surface treatment. 3.Plastic & metal product assembly. |
Q1: Are you trading company or manufacturer ?
A1: We are manufacturer, and SENPON Precision Mould is established in 2013 with our own worshop and office
Q8: How long to finish a mould?
A8: Mostly will be finished in 3~4 weeks, but some complex and big mould will spent more time. According to your order quantity,
the delivery time will be different.
Q9: How long of the mould warranty period?
A9: The mould warranty period is for 1 year(but damage caused by human factors or accident are not included on the scope of warranty), and destroied parts will be supplementary delivered free.